At BonTon Supply, we’re passionate about decorative concrete. We believe it has the power to transform ordinary spaces into stunning works of art. That’s why we’re dedicated to providing Ohio tradesmen and contractors with the highest quality decorative concrete products and expert guidance to bring their visions to life.

Have a custom project? Get a Quote >

CPR Fast Setting Concrete Patch for Loading Docks, Warehouse Floors, and Traffic Areas

On an industrial floor, the repair material is rarely the expensive part. The shutdown around it is. CPR is built for the jobs where the crew has a window measured in hours, not days.

Downtime Is the Real Cost of a Floor Repair

A broken dock edge or a pitted section of warehouse floor is a small material order and a large operational problem. The dock goes out of rotation. Forklift routes get rerouted. A shift gets scheduled around a barricade.

That equation changes the specification. On a residential patio, a repair mix can take its time. On a dock face that has to carry a trailer on Monday morning, cure time is the controlling variable and everything else is secondary.

CPR Concrete Patch and Repair is a fast setting, non shrink repair mix formulated for exactly that pressure. It is a polymerized blend of hydraulic and Portland cements, and it is a just add water product, which removes one more variable from a repair happening under time pressure.

What Fast Set and No Shrink Change on Site

Fast setting gets the attention, but non shrink is what determines whether the repair holds.

A mix that shrinks as it cures pulls away from the edges of the repair. That opening becomes the entry point for water, and on an exterior dock in Ohio, water in a repair joint means freeze and thaw working the patch loose over one winter. Non shrink formulation keeps the material tight against the sound concrete around it.

Fast set then compounds the benefit. The shorter the working window, the more accurately a crew has to place and finish the material, and the sooner the surface can take load again. It is a material that rewards a prepared crew and punishes an improvised one.

No Primer Required

Most repair systems put a bonding agent between the substrate and the patch. That is a second product, a second step, and a wait between the two.

CPR bonds without a primer. On a floor repair happening between shifts, removing that step and its dry time is often the difference between finishing the job and coming back tomorrow.

That does not remove the prep requirement. Unsound concrete still has to come out and the surface still has to be clean. What it removes is the extra material and the extra wait, and on time critical work those are the two things in shortest supply.

Vertical, Overhead, and Edge Repairs

Industrial concrete damage is not confined to flat surfaces, which is where most patching products run out of usefulness.

CPR can be troweled on vertical and overhead surfaces. That covers dock faces, bumper mounts, curb and column bases, the underside of a slab edge, and the leading edges where forklift traffic breaks concrete away first.

Those edge repairs are the ones that matter operationally. A crumbling dock nose is the failure that takes a bay offline, and a broken column base is the one that gets flagged during an inspection walk.

Facilities operating under general industry rules also have maintenance obligations attached to walking and working surfaces. OSHA addresses those under 29 CFR 1910 Subpart D, and the standards are published in the OSHA 1910 table of contents. Facility managers should confirm what applies to their site with their own safety personnel rather than relying on a supplier summary.

The 20 Pound Pail or the 50 Pound Bag

The two package sizes are not a pricing decision. They are a job type decision.

The 20 pound pail suits smaller scopes and vertical or overhead work, where mixing more than a crew can place before it sets is a real risk. It also reseals, which matters for maintenance teams keeping repair material on hand for problems that show up without notice.

The 50 pound bag suits larger repairs and scheduled maintenance work, where a crew is working through several areas in a single window and the volume justifies bulk.

Facilities running an ongoing maintenance program usually keep both. Pails handle the unplanned failures. Bags handle the planned shutdown.

When Pro Bond Ultra Is the Better Choice

Fast setting is an advantage only when speed is the constraint. On repairs where it is not, working time becomes more valuable than cure time.

Pro Bond Ultra is the better call when a repair covers meaningful area, has to build slope toward a drain, or needs a finished appearance rather than a functional one. It fills, rebuilds, repairs, and smooths, and it works as either a base coat or a finished top coat.

Our page on rebuilding spalled concrete works through that decision and through how to tell surface damage from a structural problem before any material gets ordered.

For fine cracking rather than broken concrete, neither product applies. Hairline Crack Fill handles non moving cracks up to roughly an eighth of an inch, applied with a sponge or hand trowel and requiring no primer.

Sealing an Industrial Repair

Repairs on exterior docks, ramps, and approaches take de-icing salt and standing water, which is what caused the original damage in most cases. Leaving the finished repair unsealed invites the same deterioration back.

Pro Seal 2500 is a higher solids solvent based sealer suited to exterior industrial exposure. For interior floors and lower VOC requirements, Pro Seal is the water based option. Our guide to sealer selection covers how exposure should drive that choice.

Why Ohio Facilities Buy Repair Mix From BonTon Supply

BonTon Supply distributes the Stone Edge line to Ohio contractors, tradesmen, and facility teams. The staff used these products on job sites for more than a decade before becoming a distributor, which means the conversation about a dock repair starts with what failed rather than with what is on the shelf. There are no minimum order quantities, so a single pail is a real order.

If you are looking at a dock, ramp, or warehouse floor that has to be back under load before the next shift, the material has to match the window you have rather than the one you would prefer. The BonTon Supply team can help you size the repair, pick between fast set and workable, and get material moving. Contact us to describe the damage.